Data Quality

Aterio follows a structured validation process to ensure that key figures such as total power capacity, number of facilities by state, or provider-specific footprints are accurate and aligned with industry disclosures. Each data point is verified using a combination of public sources, including utility filings, 10-Q reports from public companies, permitting records, and satellite imagery.

For power capacity, we confirm generator counts and models through permitting data and visual inspection. These estimates are then cross-checked against manufacturer specifications and official provider disclosures. For example, if Microsoft reports using 3MW Caterpillar C175-16 generators, we validate both the type and number installed to ensure our totals reflect reality.

At the regional level, we reconcile our data center counts with regulatory filings, operator announcements, and public infrastructure documents. When a provider claims a specific footprint in a state, we locate and verify each facility individually to ensure that our numbers are both granular and consistent with what the industry reports.

Last updated